xshops

Pacific Blue Reflective Long Lead - 30ft

Pacific Blue Reflective Long Lead - 30ft - Main image
$28.8 $48 In stock

Category: Wilderdog

Still working on your recall? Grab a 30 foot rope leash to give your dog room to roam, while still keeping him safe. Our long lead is also great to use as a tie-out while camping. (*But don't leave dogs unattended on a tie-out!) 

  • Length: 30 ft
  • Made with tightly spun, polypropylene/polyester ⁵⁄₁₆ in rope
  • Woven with reflective strands for use in low or no light conditions
  • Aluminum carabiner swivels and locks
    • Carabiner width: 1.5 in
    • Carabiner length: 2.5 in
    • Rated for 3 kN
  • Suitable for all dogs

Customer Reviews (4.8 / 5 · 21 reviews)

Christopher ★★★★★

My dog finally gets to explore the woods without me tripping over a short leash, and the 30-foot length is perfect for camping tie-outs too. The rope feels sturdy enough to handle her pulling, and the reflective bit gives me peace of mind on evening walks.

Sofia D. ★★★★★

Took this on our camping trip and used it as a tie-out while I set up the tent—the 30 feet gave him plenty of sniffing room without me worrying about him darting off. The reflective stitching caught my headlamp beam clearly at dusk, which was a nice safety bonus.

Ruby ★★★★★

The 30-foot length finally gives my dog real freedom to sniff around on hikes, and I love that it doubles as a tie-out for camping trips. The reflective stitching is a thoughtful touch for early morning or evening walks when visibility drops.